ABM Mosty has installed a new twin span arch over a busy motorway in Slovakia. The bridge reconnects the Alps and Carpathian Mountains allowing for the large wild animals as deer, brow bear or lynx to safely migrate between the two territories thus maintain their genome diversity.
The total length of the structure is 112,5m. The structure has been installed in two phases so not to disturb the heavy traffic. The job was completely finished in February 2016.
short news from local TV – https://youtu.be/zVG8D067Wrc