Motorway D2, new green bridge
The new structure is so called green bridge connecting the Alp and the Carpathians Mountains allowing the wild animals to migrate. The structure was constructed over a live motorway with minimum disruption to the heavy motorway traffic. The installation has been done by halves. The first halve in 10 days and the second in just 8 days which is total 18 days for 112,5m long structure.
- CLIENT NDS a.s. (Slovak Highways Agency)
- YEAR 2015
- INSTALATIONI. phase 07/09/2015 - 16/09/2015
II. phase 13/10/2015 až 20/10/2015 - CONSULTANTTerraprojekt a.s.
- STRUCTUREPrecast ABM twin span arch including for precast wing walls
- SPAN38,7m (clear) allowing hard shoulder and 3 lines in each direction
- HEIGHT7,4m (clear) and min. 5,35m for traffic
- LENGTH92,5m long as 37rings by 2,5m plus the wing walls, total 112,5m